As we continue to decarbonize our systems and adapt to a changing climate, electricity demand in Canada is forecasted to grow 1.6 to 2.1 times by 2050.1 This growth will strain the existing electrical infrastructure of many buildings, which currently account for 17% of the country’s total emissions.2 For multi-unit residential buildings (MURBs), these demands include shifts from natural gas to electric systems, as well as changing tenant needs due to climate change.

How can we prepare for the impact of those changes?

An Electrical Planning Report (EPR) can help a building owner or property manager to understand the existing electrical capacity of their facility and identify the necessary infrastructure upgrades to accommodate future electrification requirements.

Legislation for stratas to obtain EPRs

In British Columbia, legislation now requires strata corporations (with five or more strata lots) to obtain an Electrical Planning Report (EPR) by December 2026 or 2028, depending on the region. The report must be completed by a registered professional electrical engineer or company registered with Engineers and Geoscientists BC (EGBC).

“There is an increasing demand on electrical systems from EV chargers, the addition of air conditioning, heat pumps, and other gas-to-electric fuel switching,” notes Casey Gaetz, Principal and Electrical Team Co-Leader at Prism Engineering.

“This legislation aims to ensure that MURBs are ready. As building owners and property managers look for opportunities to meet their electrical infrastructure needs, it’s essential to understand the additional power requirements each new load brings. An EPR can provide them with a roadmap that predicts future capacity needs and recommends solutions to prepare the electrical infrastructure of their building to handle increased demand safely and efficiently,” he explains.

Casey points out that an EPR can be particularly helpful for an older building, where the strata organization will be planning to replace the 30, or even 40+ year-old equipment.

“The EPR can serve as a starting point analysis to ensure that any new equipment you size is suitable for these future potential loads,” he says.

 What does an EPR include?

Typically, an Electrical Planning Report answers three main questions:

Electrical Planning Report Process Steps

At Prism, we develop a report after conducting a complete review of the electrical infrastructure, collecting data from BC Hydro, and a site review.

“We go beyond a basic calculation of existing loads by looking in detail at the actual electrical usage of the building,” adds Casey.

Our team of electrical engineers then performs an analysis to assess the capacity of the building based on forecasted future demand.

“After collecting the data, we generate detailed reports with actionable recommendations customized for each building. With this valuable information in hand, building owners and property managers can make smarter decisions on how to upgrade their systems and start implementing those measures,” says Chris Fontaine, Associate and Electrical Team Co-Leader at Prism.

The big picture

Prepare your building for an `electric` future with the following steps:

Customizing your EPR

Prism can also customize EPRs to meet clients’ needs. This is possible thanks to the collaborative work among our electrical, mechanical and energy teams.

“By having everyone in-house, our teams can work together to find solutions for very complex energy-efficient upgrades. This adds value to our services and differentiates Prism from the competition”, explains Chris.

These are some of the custom service options offered by Prism:

      • Electric Vehicle (EV) Ready Plan: An assessment to determine whether a building is prepared for EV chargers, as well as recommendations.
      • EV Update: An assessment for buildings that already have EV charging infrastructure in place but may require upgrades.
      • Low Carbon Electrification (LCE) Add-On: A detailed review of gas-to-electric fuel switching opportunities.
      • In-Depth Cooling Study: A detailed review of air conditioning options.
      • Design of Electrical and Mechanical System Upgrades: A document tailored to the recommendations provided by the Electrical Planning Report.
Putting it all together

MURB Electrical Planning Report - Two engineers looking over draft papers

Working with an engineering firm like Prism can help strata organizations navigate regulations and requirements, avoid the risks associated with inaccurate load assessments, and plan for the long-term.

“One of the key advantages of working with Prism is the longevity of our assessment. With the expertise of our team, we can identify the minimum service size required to support future electrification measures without overdesigning the system, ultimately saving or eliminating significant construction costs in the future,” explains Chris.

Adam Franklin, Associate and Electrical Engineer, and Chris Fontaine,
Associate and Electrical Team Co-Leader, reviewing building electrical plans.


Prism is here to support your organization’s success.

Connect
Chat with our Electrical team

Learn more
Electrical Planning Report

Read more about big picture planning and electrification services
Decarbonization Planning
Electrical Assessment Reports: Your Roadmap to EV Charging
Electric vehicle charging in strata corporations
EV Charging
Low Carbon Electrification


1 The Big Switch – Powering Canada’s Net Zero Future,” Canadian Climate Institute, accessed on October 22, 2024.
2 Building Climate Solutions – A proven path to lower carbon emissions,” Canada Green Building Council, accessed on October 22, 2024.